Guide · Installing the flush pocket door frame

How to install the pocket frame for flush pocket doors

The pocket frame is the box the flush door slides into: it is assembled on the floor, set plumb and square, and fixed in the masonry, before plastering, or in plasterboard. These are the 9 steps of the FIP sheet for the pocket frame.

  • 9 steps
  • ~10 mm more for the opening than the frame
  • 105 / 125 mm finished wall thickness
Pocket frame for flush pocket doors seen from the front: the box with mesh inside the wall, the upright at the entrance, the spacers, the opening left about 10 mm larger than the frame opening = frame + about 10 mm A · box with mesh D · spacers B · upright FINISHED FLOOR
The opening in the wall is left about 10 mm wider and higher than the pocket frame; the spacers are removed only once the cement is dry.
How it is organised

Two phases, 9 steps

First the pocket frame is assembled on the floor, then it is fitted in masonry still to be plastered or in plasterboard. The finished walls are 105 or 125 mm thick.

You'll need

  • Trowel
  • Drill
  • Plumb line
  • Tape measure
  • Gloves
  • Pincers

The tools are those shown on the installation sheet for the pocket frame.

Phase 1 · steps 1–5

The pocket frame

The pocket frame is assembled on the floor and set plumb before it is fixed.

  1. 1

    Check the components

    The pocket frame pack contains: A box with mesh (with the small fittings), B upright, C profile and 2 spacers D. It also contains the door accessories and the carriage kit.

  2. 2

    Fix profile C

    Insert profile C into box A and fix it with 2 screws Ø 4 × 19.

  3. 3

    Fit the upright

    Fix upright B to box A with 6 screws Ø 3.9 × 13.

  4. 4

    Insert the spacers

    Insert the 2 spacers D.

  5. 5

    Plumb and square Caution

    Set the pocket frame plumb and square (90°), taking the finished floor as the 0 reference.

Phase 2 · steps 6–9

Masonry or plasterboard

Step 6 is for masonry still to be plastered, step 7 for plasterboard; from step 8 on, both continue the same way.

  1. 6

    In masonry ~10 mm

    Leave the opening about 10 mm wider and higher than the pocket frame. Bend the fixing lugs, fix them with cement and check the plumb again.

  2. 7

    Plasterboard wall ~10 mm

    Leave the opening about 10 mm wider and higher than the pocket frame, then screw the boards to the profiles.

  3. 8

    Fill and skim

    Fill along the profiles around the whole perimeter and skim the wall.

  4. 9

    Remove the spacers Caution

    Only remove the spacers once the cement is completely dry.