With D.M. 21 November 2025, no. 229, the Ministry of Education and Merit has made 223.7 million euros of PNRR funds available for fire safety upgrades and urgent safety works in school buildings: the works must be completed by December 31, 2026. Hospitals, public offices, public accommodation facilities: the situation is the same. Hundreds of construction sites open across Italy, all with a common requirement in their specifications — REI doors.
If you manage a construction company, are a site surveyor, or a purchasing manager, this article is for you. It doesn't explain what an REI door is — you already know that. It explains what you need to order correctly, what classes are required in the most common public procurement contexts, and how to receive the documentation that the works director will request at the end of the project.
The Context: Why there is such high demand right now
The PNRR (National Recovery and Resilience Plan) has opened a large number of construction sites on public buildings. Mission 4 — Education and Research — finances fire safety adaptation interventions for primary and secondary schools with contributions up to 500,000 euros per single building.
But schools are just the tip of the iceberg. PNRR projects are simultaneously progressing on:
- Community Homes and Community Hospitals (Mission 6 — Health)
- Public offices and PA headquarters
- Municipal sports and cultural facilities
- University residences
In all these contexts, fire safety adaptation almost always includes the replacement or new installation of REI doors. The stringent deadline of the PNRR — works awarded by April 30, 2026 and completed by December 31, 2026 — means that those who need to order doors have no time to lose with slow supplies or incomplete documentation.
What the Specifications Say: REI classes in the most common public contexts
In public procurement specifications, the required REI class depends on the type of building, its height, and the specific point where the door is to be installed. Here is where designers start from.
Each activity has its own technical rule: for schools, D.M. 26 August 1992 or, alternatively, the technical rule of the Fire Prevention Code (D.M. 7 August 2017); for healthcare facilities, D.M. 18 September 2002 or the technical rule of the Code (D.M. 29 March 2021); for offices, D.M. 22 February 2006 or the technical rule of the Code (D.M. 8 June 2016). The required classes change with the height of the building, the fire load and the point where the door is installed: the most commonly used are REI 60 and REI 120, and they are set by the fire safety design, door by door.
⚠️ The fire safety designer and the works director are the official references for the specific REI class for each point of the construction site. The specifications and the building's fire safety design are binding.
The documentation you will need at the end of the project
This is the point that stops most construction sites. The REI door is not just a product — it is a certified system that requires specific documentation to close the file with the Fire Brigade and update the CPI.
Document 1 — Type approval or CE marking Since November 2019, pedestrian fire doors for external use and industrial doors have been required to have CE marking. For internal pedestrian doors, type approval (Italian Ministry of the Interior) under D.M. 21 June 2004 applies, because the European standard for these doors is not yet harmonised; for type-approved doors, the REI class corresponds to the European EI2 class (REI 60 = EI2 60).
Each door must be accompanied by:
- Copy of the approval certificate or CE marking documentation
- Manufacturer's declaration of conformity
- Installation, use, and maintenance manual
Document 2 — Declaration of correct installation At the end of the installation, the installer signs the declaration of correct installation: in activities subject to inspection, it is the document on which the works director or the fire safety professional bases the declaration on products (form DICH.PROD) to be attached to the SCIA, in accordance with D.M. 7 August 2012. Without this document, the door is not "up to standard" even if the product is certified.
Document 3 — Maintenance logbook In workplaces (D.M. 1 September 2021) and in activities subject to inspection by the Italian Fire Brigade (Vigili del Fuoco) (DPR 151/2011), the periodic checks of each REI door are recorded in the fire safety checks logbook, in accordance with standard UNI 11473.
What to always ask the supplier: approval plate on the door leaf, complete documentation in the delivery package, user manual. If the documentation is incomplete, the door will not pass the Fire Brigade inspection.
Ready Delivery: why it matters on PNRR construction sites
PNRR construction sites have non-negotiable deadlines. A delay in the supply of REI doors can block the completion of the site, commissioning, and ultimately, the disbursement of the contribution.
FIP Porte keeps in stock the standard classes and sizes listed below:
- REI 60 single leaf, wall openings from 80 to 120 × 215 cm
- REI 120 single leaf, wall openings from 80 to 130 × 215 cm, also for plasterboard
- REI 60 and REI 120 double leaf, wall openings from 120 to 200 × 215 cm
For non-standard sizes — frequent in historic buildings undergoing renovation — contact us before ordering: we will check feasibility and lead times with the manufacturer.
Shipping is carried out by specialized courier for windows and doors throughout Italy. With every door you receive the type approval plate applied and the manufacturer's documentation; for details of the documents, write to us before ordering.
Separating Supply from Installation: the advantage for the company
In public construction sites, the awarded company can choose to purchase the doors online and entrust the installation only to a qualified installer it trusts.
This approach has two concrete advantages:
Clear prices on supply: on porteitaliane.com prices are published excluding VAT (single-leaf REI 60 from €299.99 + VAT, single-leaf REI 120 from €319.99 + VAT), and for construction site orders we prepare a dedicated quote.
Flexibility in installation: the company chooses the qualified installer with whom it already has a trusting relationship, optimizing installation times according to the project schedule.
The manufacturer's documentation comes with the door. The declaration of correct installation is issued by the installing technician.
How to Order: the 4-step process
Step 1 — Measurement survey Measure the wall opening of each doorway: width and height at the narrowest point. For historic buildings, measurements are rarely standard — take the exact measurement of each opening.
Step 2 — Identify the required REI class From the specifications or the fire safety designer's report, extract the REI class and specifications for each point (single/double leaf, panic bar if any, portholes if any).
Step 3 — Order with correct measurements On porteitaliane.com you can configure and order REI doors with wall opening measurements. For multiple orders from a construction site, contact us via WhatsApp for a dedicated quote with scheduled delivery.
Step 4 — Receive documentation With every door you receive the type approval plate applied and the manufacturer's documentation (ask us for the details before ordering). Keep everything in the project file.
Frequently Asked Questions from Construction Sites
Can I use REI doors with ministerial approval (REI) on PNRR construction sites or do I need CE marking (EI)? For internal doors, ministerial type approval applies (D.M. 21 June 2004), and for type-approved doors REI 60 corresponds to EI2 60. CE marking of the complete door is required for doors for external use, i.e. between spaces with different climatic conditions. Always check with the works director what the specifications require.
Can I order REI doors with panic bars for emergency exits? Yes. For the Proget REI doors in our catalogue, the Exus panic bar is available, for single and double leaf, for the exits provided for in the fire safety design. The panic bar is an integral part of the certified system and cannot be replaced with uncertified components.
Do REI door installers need specific certifications? Installation should be entrusted to a qualified installer, as indicated by standard UNI 11473-1, who issues the declaration of correct installation upon completion. For checks and maintenance, on the other hand, in workplaces from September 25, 2026 a qualified maintenance technician is required under D.M. 1 September 2021.
How many REI doors are typically needed in a school? It depends on the size of the building, the number of floors and the technical rule applied: the exact number and location of each door are indicated in the fire safety designer's report.
Can I receive a quote for a multiple order from a construction site? Yes. For orders of 5 doors or more, contact us via WhatsApp with the list of required measurements and REI classes. We will prepare a quote with dedicated prices and a delivery plan tailored to your construction site's schedule.
How do I handle non-standard measurements of historic buildings? Historic public buildings often have door openings with non-standard measurements. Contact us before ordering with the measurements of the openings: we will check feasibility and lead times with the manufacturer.
Order REI doors for your construction site
On porteitaliane.com you will find type-approved Proget REI 60 and REI 120 doors, single and double leaf, in standard sizes available for immediate delivery, with the type approval plate and the manufacturer's documentation, and shipping throughout Italy with specialized courier. To find out when a REI door is mandatory, read our guide to REI doors; for classes and prices, see the guide on how much a REI fire door costs.
For construction site orders and custom quotes:
WhatsApp: +39 0941901172, for multiple quotes and delivery planning based on the schedule